Demolition Contractors Waterlooville

Find the best Demolition Companies in Waterlooville

Get up to 3 Demo Contractors quotes for your project today! Compare profiles, reviews, accreditations, portfolio, etc... and choose the best deal.

Service Needed
City or Town
Find Pros
  • Li
    4.8
    Gosport, GB

    Get Quote
  • Concrete Crusher Hire Hampshire / Mini Concrete Crusher Hire
    1
    Fareham, GB

    GAP Services Ltd GAP Services Ltd offers a concrete crusher hire service to the Building, Landscaping & Gardening Contractor. Additionally, the crusher can be hired by the DIYer. The BAVTRAK 025 crusher is a compact rubber tracked machine measuring 4553mm long by 1200mm wide, it has a generous 630mm by 330mm jaw feed area & is capable of crushing concrete, brick & stone down to 25-100mm in size. The crush size is easily adjustable. The BAVTRAK 025 crusher is capable of crushing up to 15 tons per hour on the largest setting. The BAVTRAK 025 is fitted with a discharge conveyor, so the crushed material can be placed exactly where you need it. The BAVTRAK 025 is compatible for loading with 1.5 to 3 tonne mini & 5 tonne midi excavators. One customer used a 13t machine with a 24" bucket. With the latest EU Directive on recycling & waste, you can help the Environment by recycling waste concrete & rubble & reusing on site. Save on skip hire, waste disposal & landfill tax charges. Fewer skips and vehicle movements on site reduces both the space required and potential sources of damage. Save on aggregate and hardcore deliveries onto site. Produce the grade of fill as and when you need it, instead of waiting for vehicle collections and deliveries - often delayed in traffic - to arrive. Please call for prices & availability, the Bavtrak 025 has proved to be a very popular machine & booking as early as possible for securing the crusher, will ensure that you get the machine when you need it. Full Crushing Service We can provide a full crushing service: CRUSHER + EXCAVATOR + OPERATOR

    Get Quote
  • Ha
    5
    Gosport, GB

    Get Quote
  • V.J.Fleet & Sons Ltd
    4.3
    Mengham Farmhouse, Selsmore Road, Mengham Farmhouse Selsmore Road Hayling Island, Hayling Island, PO11 9JY, GB

    Building Is What We Do V.J.Fleet & Sons Is Leading Quality Projects Who We Are V.J.Fleet & Sons is a well established independent family run business based in Hampshire specialising in all aspects of groundworks (drainage , foundations , excavations , house clearance , fencing , property maintenance , underpinning and wet pour safety surfacing to name a few) About Our Company V.J.Fleet & Sons is a well established independent family run business based in Hampshire specialising in all aspects of groundworks (drainage , foundations , excavations , house clearance , fencing , property maintenance , underpinning and wet pour safety surfacing to name a few) 1969 Trading since 4 Business partners

    Get Quote
  • Hu
    5
    Gosport, GB

    Get Quote
  • Gosport Borough Council
    2.4
    Gosport, GB

    About Gosport Borough Council Gosport Borough Council is committed to providing a wide range of services to residents and businesses in the Gosport area. We are dedicated to improving the quality of life for everyone in our community, and we work hard to ensure that our services are efficient, effective, and responsive to the needs of our residents. Our Services We offer a wide range of services, including: Council Tax Housing Planning Environmental services Leisure activities Business support And much more! Our Vision Our vision is to create a thriving and sustainable community where everyone can live, work, and play. We are committed to working with our partners to achieve this vision, and we are always looking for ways to improve our services and make a positive difference in the lives of our residents.

    Get Quote
  • Sk
    3
    Gosport, GB

    Get Quote
  • Fo
    3.9
    Gosport, GB

    Get Quote
  • JW
    4.6
    Gosport, GB

    Get Quote
  • Th
    5
    Gosport, GB

    Get Quote

Over 3,286+ Demolition Companies on our directory

Our demolition experts operate in Waterlooville and surrounding areas!

DemolitionMatch has curated and vetted Top Demolition Contractors in and around Waterlooville. Find a trustworthy business today.

Frequently Asked Questions About Demolition Contractors

Have questions about demolition services or finding the right demolition contractor in UK? We've got answers to common inquiries:

How can I get an accurate demolition estimate?

To get an accurate demolition estimate, provide the contractor with as much detailed information about the project as possible:
  • Type of Structure:
  • Size and Dimensions:
  • Materials:
  • Location and Accessibility:
  • Presence of Hazardous Materials:
  • Specific Requirements (e.g., selective demolition, salvage):
DemolitionMatch.com makes it easy to get quotes from multiple contractors so you can compare.

What is the demolition process?

The demolition process typically involves the following steps:
  1. Planning and Permits: The demolition contractor will assess the site, develop a demolition plan, and obtain necessary permits from the local authorities. This includes ensuring compliance with building codes, environmental regulations, and safety standards.
  2. Disconnection of Utilities: All utilities (e.g., electricity, gas, water, sewer) will be disconnected and capped off to ensure safety during demolition.
  3. Asbestos Removal (if required): If asbestos is present, a certified asbestos abatement contractor will safely remove it before demolition begins.
  4. Protection of Surroundings: The contractor will protect surrounding structures, landscaping, and utilities from damage using barriers, fencing, and other protective measures.
  5. Demolition: The actual demolition work begins using appropriate methods and equipment, such as excavators, wrecking balls, or specialized demolition robots.
  6. Debris Removal and Sorting: Demolition debris is carefully removed, sorted (for potential recycling), and transported to an approved disposal facility.
  7. Site Cleanup: The site is cleaned and graded to prepare it for its intended use. This might involve filling in excavations, leveling the ground, and removing any remaining debris.
The exact process may vary depending on the size and complexity of the project, but safety and environmental responsibility are paramount throughout all stages.

What is a demolition bond?

A demolition bond is a type of surety bond that protects the property owner and the local government from financial losses if the demolition contractor fails to complete the project according to the terms of the contract or fails to comply with applicable regulations. It acts as a guarantee that the contractor will perform the work as agreed upon. If the contractor defaults, the bond can be used to cover the costs of completing the demolition or to address any damages caused by the contractor's negligence.

What happens to the foundation after demolition?

The fate of the foundation after demolition depends on the specific project and the future plans for the site. Options include:
  • Removal: If the site will be used for new construction that requires a different foundation, the existing foundation will be removed.
  • Partial Removal: If only a portion of the foundation needs to be removed, the remaining part might be left in place and repurposed.
  • Left in Place: In some cases, the foundation can be left in place and covered with soil if it doesn't interfere with future use of the site.
Discuss your plans for the foundation with the demolition contractor to determine the best course of action.

How can I get an accurate demolition estimate?

To get an accurate demolition estimate, provide the contractor with as much detailed information about the project as possible:
  • Type of Structure:
  • Size and Dimensions:
  • Materials:
  • Location and Accessibility:
  • Presence of Hazardous Materials:
  • Specific Requirements (e.g., selective demolition, salvage):
DemolitionMatch.com makes it easy to get quotes from multiple contractors so you can compare.

What is the demolition process?

The demolition process typically involves the following steps:
  1. Planning and Permits: The demolition contractor will assess the site, develop a demolition plan, and obtain necessary permits from the local authorities. This includes ensuring compliance with building codes, environmental regulations, and safety standards.
  2. Disconnection of Utilities: All utilities (e.g., electricity, gas, water, sewer) will be disconnected and capped off to ensure safety during demolition.
  3. Asbestos Removal (if required): If asbestos is present, a certified asbestos abatement contractor will safely remove it before demolition begins.
  4. Protection of Surroundings: The contractor will protect surrounding structures, landscaping, and utilities from damage using barriers, fencing, and other protective measures.
  5. Demolition: The actual demolition work begins using appropriate methods and equipment, such as excavators, wrecking balls, or specialized demolition robots.
  6. Debris Removal and Sorting: Demolition debris is carefully removed, sorted (for potential recycling), and transported to an approved disposal facility.
  7. Site Cleanup: The site is cleaned and graded to prepare it for its intended use. This might involve filling in excavations, leveling the ground, and removing any remaining debris.
The exact process may vary depending on the size and complexity of the project, but safety and environmental responsibility are paramount throughout all stages.

What is a demolition bond?

A demolition bond is a type of surety bond that protects the property owner and the local government from financial losses if the demolition contractor fails to complete the project according to the terms of the contract or fails to comply with applicable regulations. It acts as a guarantee that the contractor will perform the work as agreed upon. If the contractor defaults, the bond can be used to cover the costs of completing the demolition or to address any damages caused by the contractor's negligence.

What happens to the foundation after demolition?

The fate of the foundation after demolition depends on the specific project and the future plans for the site. Options include:
  • Removal: If the site will be used for new construction that requires a different foundation, the existing foundation will be removed.
  • Partial Removal: If only a portion of the foundation needs to be removed, the remaining part might be left in place and repurposed.
  • Left in Place: In some cases, the foundation can be left in place and covered with soil if it doesn't interfere with future use of the site.
Discuss your plans for the foundation with the demolition contractor to determine the best course of action.